+48 58 622 37 87

Reconstruction of Klajpeda Seaport breakwaters

Przebudowa falochronów wejściowych do Portu Kłajpeda

 

June, 2021   

Description:

"RECONSTRUCTION OF KLAJPEDA SEAPORT BREAKWATERS"

    

Investor:

Klaipėda State Seaport Authority

   

   

     
    

Using the BIM methodology, we designed the reconstruction of the entrance breakwaters to the Klaipeda Port. The project, apart from the traditional 2D drawing form, has been modeled in 3D.

 

The 3D models have become a direct source of data for programming construction machines with a 3D control system performing the reconstruction, which translates into a reduction in the implementation time as well as the accuracy of the works performed.