The construction of the Marina in the Prezydent Pool in Gdynia

Budowa Mariny w Basenie Prezydenta w Gdyni

 

May, 2016   

Description:

"THE CONSTRUCTION OF THE MARINA WITH FACILITIES AND TECHNICAL INFRASTRUCTURE IN THE PREZYDENT POOL IN GDYNIA"

 

Investor: 

MARINA FISHING PIER LTD.

   

   

    

We made a multi-disciplinary project documentation of building the marina in aquatory between President Quay, Kutrowe Quay and Pier No. 1 in the President's Basin in Gdynia. The documentations contains also the project of the navigational aids and the project of the communication with the superstructure of the quays.

 

The scope of the project documentations:

  • the expansion of the Kutrowe Quay with access to water and equipment,
  • the installation and equipment of four floating bridges made of the concrete (with water and electricity points, the lighting and the positions for personal watercrafts),
  • the performance of two fixed connection platforms,
  • the project of the position for the yacht to reception the sewage,
  • the performance of water-supply installation and hydrants on floating bridges,
  • the performance of point for sewage reception from boats,
  • the performance of electrical installation on floating platforms.

The maximum dimensions of the sports and recreational units that marina will support:

  • LOA < 24.0 m, B < 8.0 m, T - arbitrary, because of considerable depth in the pool.


Max unit next to a floating bridges:

  • LOA < 14.0 m


The maximum length of the unit is consistent with the definition of the recreation unit with the EU Directive.